嫩草国产-亚洲无毛-久久97-国产老头老太作爱视频-欧美久久久久久久久-成年人一级片-天天综合入口-久久精品老司机-懂色tv-草久久久久-神马午夜精品-国产黄色片在线播放-hd性videos意大利精品-少妇精品高潮欲妇又嫩中文字幕-国产在线观看成人-秋霞电影网一区二区-先锋影音av中文字幕-国产乱淫av公-日韩欧美中文在线观看-红桃视频黄色

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.